Hi, there won't be a regular ESA meeting next week -- only doing those every 2 weeks now.  So that timeslot is available anyway.  But perhaps could start at 8:30?  mike 

-----Original Message-----
From: Yury Kolomensky [mailto:YGKolomensky at lbl.gov] 
Sent: Tuesday, November 27, 2007 12:54 PM
To: Alexey Lyapin
Cc: Yury Kolomensky; Woods, Michael B.; Szalata, Zenon M.; esa-t474 at hep.ucl.ac.uk
Subject: Re: [esa-t474] ESA activities in Jan/Feb 2008

We do not have a regularly scheduled T474 meeting next week, but one can be scheduled. Or we can just use the tail end of the standing ESA meeting. I have a constraint at 11am next Monday, but hopefully we'll be done by then :)

Yury

On Nov 27, 2007, at 12:24 PM, Alexey Lyapin wrote:

>
> Hi Mike,
>
> I agree, we should have a t-474 meeting next week and discuss the 
> visit, system upgrades, and probably sign off on the NIM paper as 
> well.
>
> Cheers,
> Alex
>
>
> Woods, Michael B. wrote:
>> Hi Alexey, thanks for the message.  A 1-2 week visit ~Feb. 1 looks 
>> good.  Would likely be good to have a phone meeting to discuss items 
>> in your list below.  Perhaps next Monday?  mike ----- Original 
>> Message-----
>> From: Alexey Lyapin [mailto:al at hep.ucl.ac.uk] Sent: Tuesday, November 
>> 27, 2007 4:13 AM
>> To: esa-t474 at hep.ucl.ac.uk
>> Subject: [esa-t474] ESA activities in Jan/Feb 2008 Hi all, Bino and I 
>> were thinking about what needs to be done in the ESA before the run 
>> in April, actually well before that run as there will surely be a lot 
>> of things to do just before the run. As we may not have another high 
>> energy operation period, we should be prepared.
>> So, a draft plan for some work we think of doing in January/ February 
>> next year is below. Please, add anything you believe we missed!
>> Best regards,
>> Alex
>> ESA - End Jan/Beginning Feb 2008 ???
>> ************************************
>> - one to two weeks
>> - 2 people from UK
>>    -> Bino, Stewart - if no clashes,
>>       Alex - depending on visa/passport, Gary - ?
>> - Michele, Sergey - if we plan to do some magnetic measurements
>> - TODO
>> ******
>> 1. calibration tone system
>>     ------------------------
>>     - take calibration tone data over long periodes without beam
>>       -> need to analyse the data maybe before !!!!
>>     - upgrade/expand the system : upon availability of new components
>>         -> need to order components a.s.a.p.
>>         -> replace some of the amplifiers with higher power ones
>>         -> revise the cabling - 1/4" cables to processors and from
>>           calibration system, patch panels for BPM cables and 
>> couplers
>>         -> think of a more efficient way of feeding the cal tone in
>>         -> if needed, bring some of the cal system boxes back to UK
>>     - need BPM system simulation finished for next run !
>>     - more temperature sensors inside the processors.
>>       -> do we have enough AI channels on the breakout box, or VSAM ?
>>       -> more temp sensors ?
>> 2. uk bpm mover system
>>     -------------------
>>     - integrate into SCP : o need ampl voltage which is high enough :
>>                              check mover ADC specs !
>>                              --> amplifier or other means of getting
>>                                  high enough VDC ?
>>     - code in MINT to handle the ADC level as trigger for calibration
>>       cycle : need to code the calibration routine in MINT
>>     - setup macro which does the calibration with the ampls..
>>     - test & setup the scripts to directly analyse the calibration 
>> runs 3. online monitoring
>>     -----------------
>>     - do we need new modern pc+screens for monitoring ?
>>     - get some code up and running based on libbpm for online
>>       monitoring... recycle mark's stuff ?, build new Qt interface ?
>> 4. magnetic measurements ?
>>     -----------------------
>>     - need spectrometer simulation finished by next run
>>     - do we want more measurements ? : talk to sergey, michele ?
>> 5. zygo studies ?
>>     --------------
>> _______________________________________________
>> esa-t474 mailing list
>> esa-t474 at hep.ucl.ac.uk
>> https://mail.hep.ucl.ac.uk/mailman/listinfo/esa-t474
>
>
> _______________________________________________
> esa-t474 mailing list
> esa-t474 at hep.ucl.ac.uk
> https://mail.hep.ucl.ac.uk/mailman/listinfo/esa-t474




More information about the esa-t474 mailing list