[esa-t474] RE: Things to do before running
Molloy, Stephen Daniel
smolloy at slac.stanford.edu
Fri Mar 28 16:30:11 GMT 2008
Thanks for this Mark. I was planning on doing the bunch length measurements, so putting me down as Mr LOLA is fine. Also, I can be the monkey that finds the collimator edges.
Has the list of people travelling for T480 been finalised yet?
Steve
-----Original Message-----
From: Mark Slater [mailto:slater at hep.phy.cam.ac.uk]
Sent: Fri 3/28/2008 07:16
To: esa-t474 at hep.ucl.ac.uk; Watson, NK (Nigel); Fernandez-Hernando, JL (Juan); Molloy, Stephen Daniel
Subject: Things to do before running
Dear All,
Before Easter, Bino, Nigel and myself had a get-together to discuss
the upcoming run. We came up with the following list of things that need
to be done beforehand to ensure we have good BPM resolution and also some
specific T480/T474 things. Please add/remove as you see fit. Also, we will
probably be quite short-staffed for this run and so if anyone wants to
volunteer to be in charge of a specific area, do say so. I've
'volunteered' some people already so please confirm if this is OK!
Thanks,
Mark
General BPM Jobs
----------------
Determine channel map (Yury?)
Setup scripts for processing, Data quality, Calibration (HH), Cal Tone
(Bino very kindly said he will set this up beforehand and I'll make sure
it's all working beforehand)
Check Cal tone running (Alex?)
Tune Cavities (Yury?)
Alignement Mover Systems (MikeW?)
Interferometer (MikeH?)
1 Shift to determine:
Frequency Run (Freqs, decays, t0s, Bandwidth)
Calibration
Resolution/Stability
Optimise Attenuation / Dynamic Range (maybe a bit optimistic)
T474
----
Take in situ Magnet Data
Decide on fields/magnet running
T480
----
~2 shifts:
Find edges of collimators
Collimator surveys
Optics (Frank isn't available so any help here would be
appreciated!)
LOLA (Steve?)
More information about the esa-t474
mailing list